On this blog page you can see products of our several projects…
The melting furnace
The bottom structure of the melting furnace was transported as split in two parts

Split parts were connected by welding. During the connection the structure was upside down. After the connection the structure (55 tons) was turned around into a normal position.


The bottom structure ready before masonry
The converter and the top cones

The converter for stainless steel manufacturing

The top cones of converter
Slewing rings for a tilting steel manufacturing mixing furnace

The lower slewing rings of a tilting steel manufacturing mixing furnace.
In the picture the pended z-plate surfaces after machinery.

Also the surfaces of the upper slewing rings were finished by machining.
Equipment parts for steel cutting line

Press roller

Input unit of sheet band


Sideways transfer table

Thickness indicator of steel plates
Steel melting trough


Trough for steel melting process. The structure material: S690 QL
Steel structures of a bridge crane



Structures after surface treatment ready for mounting

Loading of the main girder (L30m) for transportation
The heavy door structures

The extra heavy door structures in welding assembly

The bottom block of heavy door structure after machinery


The heavy main structures will be on the top of the bottom block and the doors are moving by motored rolling mechanism.

The heavy door structures after surface treatment
Other big door structures

Door middle pillars to be assembled between the hoist up fabric doors of hangar.
Pillars are hinged from the top by hinge structure and shaft enabling their turning sideways up.

Trusses for fabric hangar door systems

Door trusses with diagonal and plate structure
Roller mechanisms for door equipment


Flue pipes for blast furnace

Fire proof material is used to get durability for extreme high temperatures.
Exact measures are achieved by machining the structures in successive operational steps.
Ladles for steel processing

Steel structures of telecommunication masts


Dredging pontoon


Scrab basket of converter, 2pcs (capacity 50m³ each)

Top cones of converter

Tube of exhaust gas of converter